Standing water around power infrastructure safety hazard: KE
K-Electric had requested civic bodies to take preventive measures before recent rains to ensure there is no water logging in...
K-Electric had requested civic bodies to take preventive measures before recent rains to ensure there is no water logging in...
Monsoon season has massively effected Karachi’s infrastructure, from roads to the electricity system, the whole city has toppled in the...
The outstanding receivables due to K-Electric (KE) have ballooned to a massive PKR 158.8 Bn on account outstanding payments from...
The outstanding receivables due to K-Electric (KE) have ballooned to a massive PKR 158.8 Bn on account of outstanding payments...
A K-Electric delegation represented Pakistan at the first regional conference of the Women in Power Sector Network in South Asia...
Once again, the so called City of Lights, Karachi, plunged into darkness as a massive power breakdown occurred in the...